The sidewalk

 

In April of 2016 appointed Councilwoman Shepler gave a report on the status of the sidewalk entry to town hall. She stated and was recorded in the town board minutes “Sidewalk/Concrete is still ongoing and waiting for another quote.”

Susan Shepler, an appointed council member, was tasked with repairing the sidewalk which was in total disrepair, but was unable to bring it to a conclusion for 9 months. The town of Thurman has a population of 67% Senior Citizens.

After reviewing all of 2016’s meetings minutes, one cannot find another mention of the progress of this important issue. Therefore, Councilman Eddy with his own money and labor corrected the problem.

Former Councilwoman Seaman acting on political motives found fault with it. Their was a fault and it was corrected and accepted by the Buildings and Codes Inspector.

Councilman Eddy deserves thanks.

 

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s